Human-driven
projects

CERCIS is driven by a deep sense of human values: whatever the nature of the project, the company develops innovative projects specifically designed to improve the living conditions of populations.

Selection of international projects

2021
today

The green
Corridor
Improving the living environment of the people of Abidjan

Country : Cote D'Ivoire

City : Abidjan

Expertises : Roads & Utilities Infrastructure, Landscaping, Civil Engineering, Design & build

Description :

This green corridor project known as « la Coulée verte du Banco” spreads over almost 40 ha & has two main functions:
– To protect the canals and limit congestion downstream at the Indénié crossroads. The project also aims to sustainably solve the everlasting problem of erosion of the soils (including around the canals) which leads to a water-logging of the basins located at the level of the bay of Cocody. The objective is thus to control erosion and therefore to limit congestion at the level of the Indénié interchange.
Many solutions are implemented to protect the canals such as the installation of gabions and certain plants to maintain the embankment.
– To create a buffer zone, a green filter, with the aim of preserving the city from CO2 emissions. Nearly 10,000 trees have been planted between the entrance to Banco and the Indénié crossroads, creating a link between the city and the forest. In addition to its environmental function, the « Coulée verte du Banco » beautifies a large segment of the northern highway.

2021
today

West cornice
of Dakar
West Cornice : the new face of Dakar

Country : Senegal

City : Dakar

Expertises : Roads & Utilities Infrastructure, Landscaping, Coastal development, Civil Engineering, Design & Build

Description :

This project stretches nearly 9.5 km from the “Plateau” to “the Mosque of the Divinity”. The concept is inspired by unique and historical
sites that we display in five sequences, connected to each other via a “cord” giving homogeneity to the cornice.
4 main lines of work are developed in parallel:
– Maritime protection including the expansion and creation of beaches
– Civil engineering and utilities infrastructures including: landscaped walls, nearly 90,000 m2 of paths for pedestrians and cyclists, more
than 600 public benches, dedicated spaces for workouts & sports, gathering spots etc.
– Landscaping and Green Spaces over 22 ha including nearly 4,000 trees and palm trees as well as 350,000 shrubs, ground covers and
other plants adapted to the seaside.
– Several architectural, artistic and design elements created to allow the addition of shops, toilets as well as sports and other
recreational features.

2020
2022

Abbatta
Lagoon
Kafolo lagoon: the green connection

Country : Cote D'Ivoire

City : Abidjan - Abatta

Expertises : Landscaping, Design & build

Description :

Planting of 55,000 shrubs and of 7,000 m2 of grass along the new 5 km road creating a total planted surface of 17,000 m2.
The plantations take place on a draining complex avoiding infiltration and deterioration of the asphalt bordering the planted areas

2020
2022

Roads of
La Mé
Creating links through the road

Country : Cote D'Ivoire

City : several cities

Expertises : Roads & Utilities Infrastructure

Description :

Cercis works to build, create & strengthen national links through the road, in particular between urban areas and rural areas covering the cities of: Akoudzin, Ananguie, Akoupé, Affery, Adzope (Flag/ Drapeau district).

2020
2022

The airport
road
Drawing the airport road

Country : Cote D'Ivoire

City : Abidjan – Port-Bouët

Expertises : Roads & Utilities Infrastructure, Landscaping, Civil Engineering, Design & build

Description :

Planting, at a regular pace, of the central reservation on a segment of more than 2.5 km extending from the Akwaba crossroads to the Abidjan international airport with nearly 20,000 shrubs and more than 500 palms & trees planted on a total area of 20,000 m2.
All the plantations are enhanced by landscaped walls painted by students from the Fine Arts School of Abidjan on the theme of travel.

2019
2022

Jacques
Prevert
A peaceful ballad in the city

Country : Cote D'Ivoire

City : Abidjan - Cocody (Riviera)

Expertises : Roads & Utilities Infrastructure, Landscaping, Design & build

Description :

Creation of two squares along the new road offering a planted promenade to visitors. Implementing a landscape noise barrier over an 800m path. More than 800 trees have been planted on the site, 60,000 shrubs and 3 ha of lawn.

2019

Aime Cesaire
Cultural Center
Structure, Sustainability & Culture!

Country : France

City : Gennevilliers

Expertises : Utilities Infrastructure, Landscaping, Civil Engineering

Description :

Realization of outdoor plots, car parks, development of dry and wet networks, creation of green spaces.

2018
2021

EIA
Airport
Erbil : The rebirth of an airport

Country : Iraq

City : Erbil

Expertises : Roads & Utilities Infrastructure, Civil Engineering, Design & Build

Description :

Developing the outdoor spaces at the ERBIL airport (Iraqi Kurdistan).
The project is conducted within different levels:
– Andalusian-inspired oriental garden with fountains, water jets, aromatic plants and automated watering system
– Improvement of the interior lanes of the airport including the creation of colored sidewalks and the planting of large tree subjects
imported from Italy as well as the installation of an automated watering system
– Development of the “VIP” area where century-old olive trees are planted in the midst of rose beds.

2018
2022

Abidjan
Seaside
A beautified seaside

Country : Cote D'Ivoire

City : Abidjan – Port-Bouët / Gonzagueville

Expertises : Landscaping, Design & build

Description :

Realization of a planted promenade by the ocean on a 7 km road. The project includes soil placement, the installation of a watering system and the planting of several thousand trees (including coconut trees) as well as several hundred thousand shrubs and ground covers. More than 10 ha of spray-resistant lawns have been planted across the project.

2018
2022

Official
Route
Asserting the splendor of Abidjan

Country : Cote D'Ivoire

City : Abidjan – Plateau & Cocody

Expertises : Roads & Utilities Infrastructure, Landscaping, Civil Engineering, Design & build

Description :

Development of several landscaping works on over 14 km including vegetated beds (in central reservations and near the tracks) as well as several dozen planters starting from the Place de la République (Plateau) and ending at the entrance of the Riviera district. The project contributes to a general embellishment of the main roads of Abidjan and offers a reorganization of parking lots in several areas of the project, including the Place de la République, the Saint Jean district, etc.
Several footpaths and paved sidewalks were made as part of this operation. A total of 2,600 trees and palms have been planted as well as more than 250,000 shrubs